Skip to content
Tuyển Dụng
← South Melbourne Plumbing Co

Lead Project Engineer (Hydraulic/Civil)

South Melbourne Plumbing Co · Hồ Chí Minh
Apply on official site ↗
Type
Full-time
Work mode
On-site
Level
Staff
Industry
Engineering / Mechanical
Salary
Thương lượng
Location
Hồ Chí Minh, Hồ Chí Minh, Hồ Chí Minh

Overview

  • Project engineering and coordination (the core of the role)
  • ​ Own projects through the lifecycle: procurement, labour budgets, progress tracking, coordination with our Melbourne site leads, through to handover.
  • ​ Run several live projects concurrently and hold the detail across all of them.
  • ​ Manage procurement: material orders, lead times, deliveries, and chasing outstanding items before they become site delays.
  • ​ Coordinate day to day between site supervisors, suppliers, and the builder or principal contractor.
  • ​ Compile handover packs, as-built documentation, O&M manuals and compliance certificates at close-out.
  • CAD and site setout support
  • ​ Work in AutoCAD on client and consultant drawing files: mark up, create points, manipulate layers, produce clean files for our site team.
  • ​ Our crews set out plumbing on site using a total station. You produce the files they work from.
  • ​ Maintain as-built drawings from site redline markups.
  • ​ This is competent, confident day-to-day AutoCAD use. It is not detailed design work.
  • Document control, RFIs and contract administration
  • ​ Own the drawing register and revision control. Confirm you are working from the latest set, every time, and so is our site team.
  • ​ Catch conflicts and gaps between drawings and specifications, and raise RFIs through to resolution.
  • ​ Track variations against the scope of work and keep the record straight.
  • ​ Own document control: version management, transmittals, and a tidy, navigable filing structure.
  • Programming and scheduling
  • ​ Build and maintain construction programmes, Gantt charts and look-ahead schedules.
  • ​ Track progress against programme, identify slippage early, and flag it to leadership with a recommended response, not just a problem.
  • ​ Forecast labour and support sequencing decisions with current scheduling information.
  • Commercial and progress claims
  • ​ Prepare and substantiate progress claim data for the Director's sign-off.
  • ​ Support the case when a claim is challenged, with evidence from the programme and the site record.
  • ​ Basic project cost tracking against budget.
  • ​ Financial processing sits with our Office Manager. Your job is to get the data right and get it there on time.
  • Quality assurance and ITPs
  • ​ Develop and maintain project-specific ITPs aligned to contract specifications.
  • ​ Track hold points, witness points and inspection sign-offs, and capture records at the right stage.
  • ​ Keep compliance documentation, checklists and registers current and audit-ready.
  • ​ We run Visibuild for site QA and Pipedrive for pipeline. You do not need to have used either. You do need to pick up a new system quickly and use it properly.
  • Estimating
  • ​ Prepare quantity take-offs and material schedules from hydraulic, drainage and civil drawing sets.
  • ​ Price bid submissions with the Director: labour, materials and subcontractor components.
  • ​ Maintain an accurate tender register and track bid outcomes.
  • ​ We have built our own schedule of rates and we use GroundPlan for take-offs. You are executing accurately against an established system, not building one from scratch. You do not need to have used GroundPlan. We will train you on it.

Summary of facts from the official posting. View original ↗

Interested in this role?

You'll be taken to the employer's official application page.

Apply on official site ↗
Is this your business? Claim this page, request edits or removal